  • 桥梁检测对操作人员的要求
  • 本站编辑:xghl发布日期:2019-06-02 10:02 浏览次数:
1.桥检车出租公司提醒你工作人员身体不能有重大疾病,并经过专业培训考试合格,在取得有关部门颁发的操作证后方可独立操作。学员必须在师傅的指导下进行操作。
 
2.装后进行下列各项检查试验,确认正常后,方可交付使用。
 
1)检查屋面机构的安装,应配合良好,锚固可靠;悬臂长度及连接方式均正确;
 
2)钢丝绳结实耐用,没有不良现象桥检车公司了解到;磨损、断丝不超限,悬挂、绕绳方式及悬重均正确;
 
3)防坠落及外旋转机构的安全保护装置齐全可靠;我们秉承"安全第一,
 
4)电机无异响、过热,启动正常、制动可靠;
 
5)吊篮应做额定起重量125%的静超载试验和110%的动超载试验,要求升降正常,限位装置灵敏可靠。
 
3.前应进行下列检查:
 
1)屋面机构、悬重及钢丝绳符合要求;
 
2)电压稳定,符合正常标准桥检车公司解到,接地(接零)保护良好;
 
3)机械设备正常,安全保护装置齐全可靠;
 
4)吊篮内无杂物,严禁超载,用户至上"经营理念。
 
桥检车
 
4.动后,进行升降吊篮运转试验,确认正常后,方可作业。
 
 
 
5.业中,发现运转不正常时,应立即停机,并采取安全保护措施。未经专业人员检验修复前不得继续使用。
 
 
 
6.用吊篮进行电焊作业时,必须对吊篮、钢丝绳进行全面防护,不得用其作为接线回路。
 
 
 
7.业后,工作人员清洗好吊篮桥检车出租公司了解到,悬挂离地面3m处,切断电源,撤去梯子。

1. The bridge inspection vehicle rental company reminds you that the staff can not be seriously ill and pass the professional training examination. You can only operate independently after obtaining the operating certificate issued by the relevant department. Students must operate under the guidance of the master.
2. After installation, carry out the following inspection tests and confirm that it is normal before delivery.
1) Check the roof mechanism installation, should be in good harmony, Anchorage is reliable; The cantilever length and connection mode are correct;
2) Steel wire rope is strong and durable, and there is no bad phenomenon. Wear and break wire are not excessive, suspension, rope winding and suspension weight are correct;
3) The safety protection devices of the fall and outer rotating mechanism are complete and reliable; We uphold "safety first,
4) The motor is no different from ringing, overheating, normal start, and reliable braking;
5) The lifting basket shall have a static overload test with a rated weight of 125 % and a dynamic overload test of 110 %, which requires normal lifting and lifting, and the limiting device is sensitive and reliable.
3. The following inspections should be performed before:
1) roof structure, suspension weight and wire rope meet the requirements;
2) Voltage is stable, in line with the normal standard bridge inspection company solution, ground(zero) protection is good;
3) The mechanical equipment is normal and the safety protection device is complete and reliable;
4) There is no debris in the hanging basket, it is forbidden to overload, and users are the first to operate.
Bridge Inspection Vehicle
4. After moving, carry out the operation test of lifting and lifting basket, and confirm that it is normal before it can be operated.
5. In the course of operation, when the operation is found to be abnormal, it should be stopped immediately and safety measures should be taken. It must not be used until it has been repaired by a professional.
6. When using a hanging basket for electric welding operations, the hanging basket and steel wire rope must be fully protected and must not be used as a wiring loop.
7. After the industry, the staff cleaned the hanging basket bridge inspection car taxi company learned that the suspension was 3M from the ground, cut off the power supply, and removed the ladder.